DEVELOPMENT SCHEDULE

18 months

DEVELOPMENT COST

$20 million

USE

Hazardous storage facility load-bearing tilt-up concrete construction

SPECIAL FEATURES

  • 3,620 SF Office
  • Six Hazardous Storage Spaces with H2, H3 & H4 Classifications
  • 350F to 460F Cooler -130F to 140F Freezer
  • 9 Dock Positions 34’ Clear Height 7” Reinforced Concrete Floor Slab 45-mil White TPO Membrane Mechanically Attached Roof ESFR Fire Protection System & AFFF System