Logistic Park Atton

Completed Project: Redevelopment of an industrial brownfield site into a next‑generation logistics facility in Atton

Atton

, Meurthe‑et‑Moselle

France

Size

31,712 m²

Use Type

Logistics

Project Highlights
  • Redevelopment of a former concrete plant and open-air storage area
  • Located in the heart of the A31 logistics corridor between Metz and Nancy
  • Highly sustainable construction and design with reuse of demolotion materials, timber structure, installation  of 5,956 photovoltaic panels.
  • 28,000 m² of the site dedicated to ecological restoration and landscaping

Scannell Properties acquired c.8 hectares of industrial brownfield land in the Atton Nord business zone located on the A31 corridor, between Metz and Nancy  The development site comprised two plots of land, a partially demolished concrete plant and an open-air storage area.

Project Objective: remediate and transform an obsolete industrial site into a modern, sustainable logistics platform, creating much-needed space in a highly supply‑constrained market.

Strategic Location

  • In the heart of the A31 logistics corridor between Metz and Nancy
  • Direct access to the A31 via the D120
  • Close to a dense and skilled employment pool

Building Specifications

  • 31,712 m² of flexible and divisible industrial and logistics space
  • Clear height: 11.50 m
  • Timber structure
  • Heat pump system (no fossil fuels)

Sustainable Redevelopment 

  • Remediation and demolition of the former concrete plant
  • Full reuse of demolition materials for road sub‑base construction
  • Project aligned with France’s Zero Net Land Take (ZAN) objective

Strong Commitment to Biodiversity

  • 28,000 m² dedicated to ecological restoration and landscaped areas
  • Preservation and enhancement of existing vegetation
  • Creation of woodland clusters, meadows, local‑species plantings, and vegetated ponds
  • 200 m of existing ecological corridors restored, and an additional 200 m created along the north‑west and west boundaries

Energy Performance & Renewable Production

  • BREEAM Excellent certification
  • 12,000 m² of rooftop equipped with 5,956 photovoltaic panels
  • Estimated output: 7 MWp/year, equivalent to the lighting consumption of a 2,000‑inhabitant town
No results found.